| Development of several different designs for direct bonded, end-anchored and shallow depth sleepers and bearers |
|
2022-2025 |
| |
|
|
| Technical support for concrete mix designs with CEM I, II, III cements and fiber reinforced concrete for the use of prestressed concrete sleepers and bearers |
|
2023-2024 |
| |
|
|
| Development of a fixation system for embedded anchor bolts in Longline production lines |
|
2022 |
| |
|
|
| Consulting and tendering for a new carousel sleeper plant in Germany with direct bonding and a capacity of minimum 500.000 sleepers/year |
|
2020-2021 |
| |
|
|
| Technical support for a new ballast-less track system according German DB requirements |
|
2024-2025 |
| |
|
|
| Technical support and design for a new carousel sleeper plant in Romania with a capacity of minimum 350.000 sleepers/year |
|
2024 |
| |
|
|
| Consulting and tendering for a new carousel sleeper plant in Ireland with a capacity of minimum 165.000 sleepers/year for end-anchored and post tensioned sleepers |
|
2024-2025 |
| |
|
|